Console looks different? You may be on the earlier workflow, see the v4 overview.
Quickplay
Push a single composition live immediately for a set duration. Overrides whatever is scheduled and hands playback back when the duration ends.
Schedule
Run one or more compositions between a start date/time and an end date/time.
Advanced Schedule
Build a content calendar with day sequences, time slots, and day-of-week rules. You switch to it from inside the Schedule flow.
Advanced Schedule is not a separate button. Start a Schedule, then switch to it from the Advanced Options card on the Configure Schedule page.
Which publish type should I use?
The three steps, and the review
Quickplay and Schedule both run through the same wizard, shown as a progress bar at the top of the page:1
Configure
Set the duration (Quickplay) or the date and time window (Schedule).
2
Select Content
Pick the composition or compositions to play.
3
Select Screens
Choose which screens get the content.
Reading the Schedules list
The Schedules tab lists every schedule with its Status, Type, Start Date, End Date, and Screens Assigned.
Use the Active and Upcoming chips to filter the list. Schedules whose end date has passed are hidden until you tick Show expired schedules.
A schedule with no screens is still listed as Active or Upcoming, it simply has nothing to play on. Add screens from the row’s ⋯ menu using Assign Screens.
Managing a schedule after it is published
Click the ⋯ menu at the end of any row in the Schedules tab:View Details
View Details
Opens the schedule’s own page with Info, Content, and Screens tabs, plus details such as who created it, when it was last modified, and its schedule ID.
Edit
Edit
Reopens the wizard with everything filled in, so you can change dates, content, or screens. Republish to apply the changes.
Assign Screens
Assign Screens
Jumps straight to screen selection, useful for a schedule you saved with Skip for now.
Duplicate
Duplicate
Creates a copy you can adjust, rather than rebuilding a similar schedule from scratch.
Delete
Delete
Removes the schedule from every assigned screen. This cannot be undone.
Where the default composition lives
The default composition is what a screen falls back to when no schedule and no Quickplay is running. It is set per screen, not in the Publish module:- Go to Screen and click the screen you want.
- Open the Content tab.
- Under Default Composition, click Change.
Related
- Quickplay, push one composition live right now
- Schedule, run content between a start and end date
- Advanced Schedule, build a recurring content calendar